- Full-time
P6 Construction Scheduler
The P6 Construction Scheduler is a core Project Controls role responsible for developing, maintaining, and communicating accurate, logic-driven project schedules across our portfolio of EPC power infrastructure projects. Using Oracle Primavera P6 as the primary platform, you will own schedule integrity from baseline through monthly updates, look-aheads, and recovery planning.
You will partner closely with Project Managers, Superintendents, Estimators, and Project Controls to ensure schedules reflect real field progress, resource constraints, and critical path risk. This is a hands-on role for someone who understands construction sequencing in solar, BESS, substation, and transmission work and can translate that knowledge into clear, decision-useful schedules that drive execution and accountability.
Competitive base salary commensurate with experience, performance bonus eligibility, and benefits package. Opportunity for growth as the Project Controls function scales with the company.
Required
- Bachelor's degree in Construction Management, Engineering, or related field preferred; equivalent experience considered.
- 4+ years of construction scheduling experience with strong proficiency in Oracle Primavera P6 (required).
- Demonstrated experience building and maintaining CPM schedules for multi-discipline construction projects.
- Solid understanding of construction sequencing, critical path method, resource loading, and progress measurement.
- Ability to translate field conditions and Superintendent input into accurate schedule logic and durations.
- Strong analytical skills and clear written/verbal communication; comfortable presenting schedule status to project and senior leadership.
- Proficiency with Microsoft Office (especially Excel); willingness to work within construction project controls ecosystems (Trimble, etc.).
Preferred
- Direct experience scheduling utility-scale solar, BESS, substation, transmission, or heavy civil / power infrastructure projects.
- Experience with resource-loaded schedules, earned value integration, and schedule risk analysis.
- Familiarity with delay analysis, time impact analysis, and forensic scheduling techniques.
- Prior experience in a self-performing EPC or general contractor environment with multi-project portfolios.
- PMP, PSP (Planning & Scheduling Professional), or similar certification a plus.
Baselines are realistic, fully logic-driven, and accepted by project teams as the plan of record. Monthly updates and look-aheads are accurate, timely, and used actively by Project Managers and Superintendents. Critical path and major risks are visible early; recovery options are developed before problems become crises. Schedule and cost/WBS structures stay aligned, supporting clean project controls and forecasting. You are trusted as the schedule owner who brings clarity, discipline, and constructive challenge to project delivery.